Once the concrete slab has been poured and cured, many new homeowners in Perth feel the excitement of finally seeing their walls rise. The brickwork stage is when your house really begins to take shape, as the bricks form the structure of your home. However, alongside the excitement, this stage also requires careful attention. Bricklaying is a crucial checkpoint in construction — any mistakes or defects at this stage can impact the strength, appearance, and long-term durability of your house if not picked up early.

 

As local inspectors, we often step in at this stage to check that the brickwork meets Australian Standards, complies with the National Construction Code, and suits Perth’s unique soil and weather conditions. Let me guide you through why this stage is important, what we look for, and how it safeguards your investment.

The Rules That Brickwork Must Follow

In Perth, brick walls must meet strict benchmarks. The key standards are:

These rules control everything from how straight and plumb walls must be (no more than 10 mm lean in 3 m) to the thickness of mortar joints (about 10 mm). They also require articulation joints (vertical gaps) in long walls to prevent cracking on clay soils, and special corrosion-resistant materials near the coast.

 

Put simply, they exist to make sure your walls don’t just look neat today, but stay strong for decades in Perth’s shifting ground and salty air

Brickwork Tolerances and Issues

When your home is at the “plate height” stage (brick walls completed up to the point where the roof will sit), it’s the perfect time for a detailed inspection. Homeowners and inspectors will be checking that the bricklaying quality meets the expected tolerances and that there are no visible defects. Below, we break down some key areas that are examined during the brickwork stage, and common issues to watch for in each.

Masonry / Brickwork Tolerances
A Horizontal position of any masonry element documented or shown in plan at its base or at each storey level 15 mm
B Relative displacement between loadbearing walls in adjacent storeys intended to be in vertical alignment 10 mm
C Maximum deviation from plumb within a storey from a vertical line through the base of the member Lesser of 10 mm per 3 m height or 0.05× leaf thickness
D Maximum deviation from plumb in total height of the building (from the base) 25 mm
E Max horizontal/vertical deviation of a surface from a plane surface (bow) in any 2 m length 5 mm
F Deviation (step) of any exposed masonry surface from any adjacent exposed masonry surface 2 mm
G Deviation of bed joint from horizontal, or from the level documented or shown in elevation 10 mm in any 10 m, 15 mm total
H Deviation from documented thickness of bed joint 3 mm
I Minimum perpend thickness 5 mm
J Deviation from documented thickness of perpend ≤ 10 mm
K Deviation from documented width of cavity minimum width as required by the Building Code of Australia 15 mm

As a building inspector, we first check the overall look of the brickwork. For visible (face) bricks, the colour and texture should be consistent, with only small natural variations. Cracks, flaking, heavy mortar smears, or white salt marks (efflorescence) are warning signs, though efflorescence can often be cleaned. WA standards also require finished bricks to be free of excess mortar.

 

If the walls will be rendered or painted, small chips or colour differences aren’t a big issue—the priority is structural strength. But for exposed brickwork, you should expect a neat, uniform finish with the best side of each brick facing out. Rougher faces inside garages or cavities are normal. The bottom line: visible brickwork should look tidy, and all brickwork must be strong and built to standard.

Mortar joints are just as important as the bricks themselves. They should be around 10 mm thick (about a little finger’s width) and kept uniform across the wall. If joints vary too much in size or aren’t fully filled, the wall can be weakened and gaps may let in water or pests. The only intentional openings should be weepholes or vents.

 

Mortar also needs to bond firmly to the bricks without crumbling away. Small hairline cracks can be normal as it dries, but bigger cracks or soft mortar are defects. For visible brickwork, joints should also look neat and consistent, with excess mortar cleaned off—messy smears or uneven lines don’t meet WA standards and usually require fixing.

“Brick blending” is all about making sure the colour of your walls looks even. Because bricks are made in batches, each batch can vary slightly in shade or texture. If a bricklayer uses one pallet at a time without mixing them, you could end up with sections of wall that look noticeably different. To avoid this, standards require bricks to be taken from multiple pallets and blended as they’re laid, so any natural variations are spread evenly across the whole wall.

 

If blending isn’t done properly, parts of your home may look patchy or mismatched, which is considered a defect under WA’s tolerances guide. In some cases, builders may have to stain or even replace sections to fix the problem. Natural variation is normal, but blending ensures it’s distributed evenly, giving your home a consistent, uniform appearance instead of a blotchy one.

When it comes to face brick walls, it’s important to know the difference between cosmetic issues and structural ones. Cosmetic issues only affect the look of the wall, like a small chip, slight colour variation, or mortar that looks a bit rough. Structural issues, on the other hand, impact the wall’s strength—such as large cracks, loose bricks, or walls that aren’t straight. WA’s tolerance guide makes it clear: if the wrong side of a brick is facing out on a feature wall, or mortar stains are left on the surface, that’s a defect that should be fixed even if it doesn’t affect strength.

 

The key is this: minor blemishes are often acceptable (especially if the wall will be rendered), but anything that compromises stability or falls outside the expected visual standard should be repaired. Cosmetic flaws can usually be cleaned or corrected, while structural problems—like missing mortar in joints, cracked load-bearing bricks, or crooked lines—must be addressed for safety. The goal is brickwork that’s not only sound but also presents a neat, consistent finish where visible.

Wall placement and openings are just as important as the bricks themselves. At this stage, inspectors check that walls match the building plans exactly—dimensions, corners, and room sizes should line up with the slab, with only small tolerances allowed. Door and window openings must also be in the right spots and sized correctly; otherwise, frames may not fit later. Walls must stand plumb (vertical) and straight; anything leaning or bowed beyond tolerance is a defect that may need rebuilding.

 

We also look for articulation (control) joints in long walls, which allow for movement and prevent cracking, and confirm that lintels or beams are properly installed above openings. Load-bearing piers or columns must be positioned exactly where the plans specify to support structural loads. In short, this part of the inspection ensures the “skeleton” of the house is accurate, straight, and built to standard—so everything that follows, from windows to roof framing, fits and functions as it should.

top view of property in brickwork stage. This property is currently being inspected by building inspector for brickwork stage inspection

What to Expect During a Brickwork Stage Inspection

A brick stage inspection isn’t just about checking the bricks themselves—it’s about making sure your home’s structure is safe, straight, and built to standard before the roof goes on. Here’s what we look at:

Key things we check include:

  • Wall ties – These are small metal pieces that link the inner and outer brick walls together. If they’re missing or spaced too far apart, the walls can separate over time.
  • Lintels – Steel or concrete beams that sit above doors and windows. They need to be the right size and sit firmly into the brickwork to prevent sagging or cracks later.
  • Tie-down straps – Metal straps or rods that connect the brick walls to the roof frame. These are essential in Perth’s windy conditions to stop the roof lifting off.
  • Flashings & weepholes – Flashings are waterproof barriers placed above openings, and weepholes are small gaps at the bottom of walls. Together they let rainwater escape instead of soaking into your home.
  • Cavity gaps – In double-brick walls, there’s a gap between the two skins that stops moisture from reaching inside. We check that mortar hasn’t dropped in and blocked this space.
  • Control joints – These are vertical gaps in long walls that allow the brickwork to move slightly without cracking. We make sure they’re in the right spots and properly sealed.
  • Other structural items – Things like supports for balconies, pergolas, or feature brickwork (arches, corners, pillars) need to be correctly built now, not added later.

Why Professional Brickwork Inspections Matter

You might wonder if hiring an independent inspector is really necessary. After all, builders do their own checks. But a professional construction stage inspection gives you an unbiased review that’s 100% in your interest as the homeowner.

Common defects we often catch early:

  • Sagging lintels – undersized or poorly installed supports above windows/doors that can crack brickwork and jam frames.

     

  • Missing control joints – without them, long walls in Perth’s clay soils can develop big cracks over time.

     

  • Poorly aligned boundary walls – even small errors can cause council issues or legal disputes with neighbours.

     

  • Missing wall ties or reinforcements – weakens the wall’s strength, especially in high winds.

     

  • Early cracks/foundation movement – an inspector can tell if it’s just shrinkage or a sign of a bigger problem.

Why fix issues now, not later?

During construction, walls are still accessible and bricklayers are on site—making corrections quick and affordable. After handover, the same fix could mean demolishing finished sections, costing thousands.

Protecting you as the owner

A brickwork inspection report keeps your builder accountable and gives you solid proof if you ever need to make a warranty claim. It also gives you peace of mind—knowing that any hidden problems were caught and fixed early, or that no issues were found at all. In fact, most good builders in Perth appreciate inspections because they help deliver a higher-quality home and happier clients.

When to Schedule Your Brick Stage Inspection

The best time to inspect brickwork is after all bricklaying is complete but before roof framing begins. Once the roof structure goes on, parts of the walls become harder to see, and any issues are much more difficult to fix.

To get the timing right:

  • Communicate with your builder early. Brickwork can move quickly, sometimes in just a couple of weeks. Let your builder know you plan to have an inspection so they can give you an estimated finish date and hold off on starting the roof if needed.

  • Inspect promptly. Aim for the day the bricklayers finish or the next day. Waiting too long risks critical areas being covered up by the roof, plaster, or internal finishes.

  • Check before other trades cover the work. In Perth, windows, doors, and conduits may be installed during brickwork. Try to have the inspection before render or plaster goes on, as these can hide cracks, gaps, or mortar issues.

  • Don’t miss this stage. Skipping a brick inspection means most defects won’t be visible again until handover—when they’re far more expensive and disruptive to fix

Final Thoughts

The brickwork stage is a key milestone in building your home. Getting it right means your walls will be strong, straight, and built to last. A professional inspection at this stage gives you peace of mind that any issues are caught early—when they’re easier and cheaper to fix.

In Perth, with our soil conditions and double-brick construction, being proactive is especially important. An inspection is not about doubting your builder, but about protecting your investment and making sure your home meets the right standards.

When you know your brickwork is solid, you can enjoy the rest of the build with confidence, knowing the “bones” of your house are sound. Think of it as investing in your future comfort and safety.

FAQs

It’s the stage after the slab has been poured when bricks are laid to form your home’s walls. It’s one of the biggest milestones where your house starts looking like a real building.

Because any errors at this stage can affect the strength, appearance, and long-term durability of your home. Fixing issues now is far cheaper and easier than once the house is complete

Bricklaying must meet the National Construction Code (NCC) and Australian Standards AS 3700 and AS 4773, along with the WA Guide to Standards and Tolerances (2019).

Crooked or leaning walls, missing or uneven mortar, cracks in bricks, missing wall ties, poorly installed lintels, lack of control joints, or blocked weepholes.

A wall can’t lean more than about 10 mm over 3 m of height. Over an entire single-storey wall, the lean must be less than 25 mm. Bowing more than 5 mm over 2 m is also considered a defect

They should be about 10 mm thick and consistent. Voids, cracks, or gaps in mortar are defects and can cause weakness or water entry.

They’re vertical gaps built into long brick walls to allow slight movement, especially important in Perth’s reactive clay soils. Without them, walls may crack

Weepholes are small openings at the base of brick walls (and above windows) that let water escape from the cavity. They must be spaced about every 1.2 m and kept clear of mortar.

Cosmetic issues (like a small chip or colour variation) affect appearance only. Structural issues (like cracks, misaligned walls, or missing supports) affect strength and safety.

Clay soils expand and contract, stressing walls, while coastal areas face salt and wind exposure. Both require proper materials, joints, and workmanship.

As soon as the bricklaying is complete and before the roof frame goes on. This ensures everything is visible and easy to fix

The inspector provides a detailed report with photos and notes. The builder is expected to fix the defects before moving forward.